P.O. Box 247  Colebrook, New Hampshire 03576

Phone: (603) 237-5000

The West Dover WWTF consisted of a large circular continuous loop reactor, anaerobic selector and a new headworks building. There were many highly detailed formwork challenges that were accomplished with ease by our seasoned crew. The project required 1,200c.y.of concrete and 80 tons of reinforcing steel.