This project included all site survey, construction, project management, quality control and administrative activities. This multi-phased contract started in the Summer of 2010 and completed in the Summer of 2011. It consisted of 3,300c.y. of concrete and over 200...
The Manchester WWTF needed to be upgraded to remain compliant with the ever changing EPA standards. VR Concrete, working with one of its long time clients, was tasked with the challenge of upgrading the facilities concrete structures without interrupting the daily...
This project is a large sequential batch reactor tank that contains 1.2 million gallons of liquid. The project consisted of 1,500c.y. of concrete and 300 tons of reinforcing steel to...
VR Concrete was awarded the Federal Corrections Institution, in Berlin, NH, in October of 2007. This was a two year project. This project included all site engineering, construction, project management, quality control and administrative activities. This 600,000s.f....
VR Concrete was contacted by the Town of Columbia, NH with a problem. They had a bridge that had to be replaced and the NH DOT gave them a budget estimate of $1,200,000.00. Since the town did not have that amount of money to dedicate to the project, they turned to VR...
The West Dover WWTF consisted of a large circular continuous loop reactor, anaerobic selector and a new headworks building. There were many highly detailed formwork challenges that were accomplished with ease by our seasoned crew. The project required 1,200c.y.of...