Brattleboro Parking Garage – Brattleboro, VT:

This was a 5-story parking structure with a cast in place post-tensioned bridge and extensive retaining walls.  VR Concrete, Inc. was contracted to perform all footings, walls, piers and flatwork for this job, which is 100% complete.  This project consumed 2,500 c.y. of concrete and 45 tons of reinforcing steel.

<<Scroll or click here to enlarge

Stratton Mountain Ski Club – Stratton, VT:

This was a 25,000 s.f. footprint, 2-story subgrade parking structure with wall heights ranging from 12’ to 32’.  VR Concrete, Inc. was contracted to perform all footings, walls, piers and flatwork for this fast track project, which was completed on time and under budget.  This project consumed in excess of 5,000c.y. of concrete and 200 tons of reinforcing steel.

<<Scroll or click here to enlarge

Carroll Transfer Station - Twin Mountain, NH:

This fast-tracked project consisted of footings, walls and flatwork and was completed ahead of schedule.

<<Scroll or click here to enlarge

Brox Quarry – Dracut, MA:

This project was a series of large piers and foundations to support a multitude of conveyors, screens and crushers. The project consisted of more than 400 anchor bolt settings that stretched out over a 20-acre site.  VR Concrete, Inc. was responsible for all survey work and anchor bolt placement on this project.  This project consumed 10,000c.y. of concrete and 400 tons of reinforcing steel. 

<<Scroll or click here to enlarge

Lowes – Gilford, NH: 

VR Concrete was contracted to provide the flatwork for this project.  A laser screed was utilized to maintain compliance with “F” number requirements.

<<Scroll or click here to enlarge

Lowes – Epping, NH:

This was a 136,000s.f. pile supported building with a structural slab, pile caps and grade beams.  This project consumed in excess of 8,000c.y. of concrete and 1,200 tons of reinforcing steel.

<<Scroll or click here to enlarge

Lewiston Parking Garage – Lewiston, ME:

This project offered many unique forming challenges.  All walls were exposed to public view and there were many detailed formwork features.  This project consumed in excess of 2,500c.y. of concrete.

<<Scroll or click here to enlarge

Rising Bear Lodge – Stratton, VT:

This was a 2-story sub-grade parking structure with a 5-story lodge.  The building footprint was +/-20,000 s.f. with approximately 800 l.f. of wall in excess of 22’ tall.  VR Concrete, Inc. was contracted to perform all footings, walls, piers and flatwork for this project.  This project consumed 3,500 c.y. of concrete and 150 tons of reinforcing steel. 

<<Scroll or click here to enlarge

Home Depot – Seabrook, NH:

This was an 110,000s.f. pile supported building with a structural slab and grade beams.  VR Concrete was contracted to perform all footings, walls, beams and flatwork for this project.  This project consumed in excess of 7,000c.y. of concrete and 900 tons of reinforcing steel.

<<Scroll or click here to enlarge

Top Furniture – Gorham, NH:

This was a 45,000s.f. building.  It housed a 10,000s.f. high rack pallet storage warehouse that required a high “F” number slab.  VR Concrete, Inc. was contracted to perform footings, walls and flatwork. This project consumed 1,000c.y. of concrete and 30 tons of reinforcing steel.

Gallery and photos coming soon.